Sean Gursky's Photo Gallery

A life captured in photos.

Home / December 10, 2021
 
 
 
20211210.jpg
 
Drywall worked finished up a week ago and since then each wall and ceiling have received five coats of paint. I went over the drywall with two coats of sealer and primer and the ceilings and walls got three coats of paint each. There are some slight blemishes to fix up but the majority of the painting is done. Next step will be to attach the toilet flange, dry fit the toilet to make sure it fits (tight space and not sure if the 12" rough in bowl will fit), and waiting for tile setting in February.
  • EXIF Metadata
  • Information
Maker Apple
Model iPhone 13 Pro
Date Time of Original 2021:12:10 16:00:53
ApertureFNumber f/1.8
Dimensions
4032*2688
Visits
263