Sean Gursky's Photo Gallery

A life captured in photos.

Home / Project 365 - Year 16 / March 12, 2022
 
 
 
20220312.jpg
 
Next up for the downstairs bathroom was a doozie. The vanity was moved in to place with some mild modifications to fit around the baseboard tile. The countertop was attached to the cabinet and then I installed the waste line to the sink and attached the faucet to the supply lines. I will wait for the yellow ABS cement to cure before testing everything out but it's in, it fits, and it looks good.
  • EXIF Metadata
  • Information
Maker Apple
Model iPhone 13 Pro
Date Time of Original 2022:03:12 14:13:24
ApertureFNumber f/1.5
Dimensions
4031*2687
Visits
185