It's done. All tile work in the bathroom is completed. I was surprised how long the tile setter spent but each wall wasn't square, a poorly positioned clean out trap caused issues and our initial shower door was too tall and the replacement was a struggle to install...meaning it was better to let a professional do the work. Now it's back to me to do the fit off for plumbing and install the toilet and vanity.
- EXIF Metadata
- Information
Maker | Apple |
Model | iPhone 13 Pro |
Date Time of Original | 2022:03:08 18:15:04 |
ApertureFNumber | f/1.5 |
- Created on
- Tuesday 8 March 2022
- Dimensions
- 4013*2675
- Albums
- Visits
- 191